Australia's #1 Consulting Service
  首页 > Coursework >
 
 

代写 Building Measurement

 

Building Measurement 1 Assessment Brief 2016 You have been supplied the designs of two different institutional building projects. You are required to: • choose any of these, • use any software application, • measure (i.e. show all your calculations in a take-off format) and prepare bill of quantities for any three of the following: o masonry o doors and windows o roof frame o roof covering o floor finishes o timberwork o external paving • make reasonable assumptions where necessary – and document all your assumptions in your query sheet, • document your answers (i.e. take-off and BoQ) only as soft copies, ensure you convert all your documents into a single portable document format file, • submit only through turnitin, before 11:59pm of May 06, 2016, • keep a receipt of your submission intact. Building Measurement 241: Marking Rubric Student Name Student ID Attribute  Fail (0-49%) Pass (50-64%) Credit (65-74%) Distinction (75-84%) High Distinction (85-100%) Formatting (10%):  Cover (Assignment title, student IDs etc)  Adherence to conventions (preamble, take-off list, page referencing, drawing numbers, job reference etc)  Packaging (neatness, evidence of professionalism in student’s work, overall quality of submission)  Collection and summary formatting No/incomplete cover sheet Poor understanding of take-off conventions   No take-off list   Poor page referencing   No preamble   Job reference/Drawing numbers not stated Submission is rough and untidy Poor quality of work No collection and Summary cells Complete but messy cover sheet Superficial understanding of take-off conventions   Incomplete take-off list   Confusions page referencing   Ambiguous preamble   Clear job reference/ Drawing numbers not stated Submission is somewhat untidy Acceptable quality of work Collection and summary cells poorly used Exceptional quality of presentation; strong evidence of understanding and fulfilment of task requirements; take-off is perfect; use of convention is faultless; pages properly referenced; clear preamble to measured work; clear referencing of job, drawing numbers and measurement work-sheet pages; tidy submission, and; Collection and Summary cells perfectly used and shown. Take-off (40%  Accuracy of data entry  Use of take-off conventions  Precision of description  Quality of outcome/reportage of data processing  Integrity of submission Poor style of data entry Proper understanding of Take-off conventions not demonstrated Lack of precision in descriptions Many unsubstantiated calcs Error in quantity measurement processes (extension, timesing etc) Integrity concern on submission Faulty style of data entry Some typo/grammatical blunders/long rambling descriptions Few unsubstantiated calcs Project not measured in appropriate context Unconvincing, untidy Few clarity and precision issues No integrity concern on submission Strong content Exceptional professional judgment No grammatical error High quality of reflection on project context Exceptional writing style Most calcs are substantiated with sketches and worked up dimensions Work is clear and precise No integrity concerns Bill of Quantities (50%)  Accuracy of measured quantities  Precision of description  Accurate itemization of measured work  Robustness/completeness of measurements  Adherence to A/SMM rules >50% of measured work lacks accuracy >50% of work description is not implementable Lack of technical depth >50 of appropriate items omitted in the Bill A/SMM rules not adhered to in more than 50% of measured items <50% of measured work lacks accuracy <50% of work description is not implementable Lack of technical depth <50 of appropriate items omitted in the Bill A/SMM rules not adhered to in less than 50% of measured items All items are measured accurately All work description are perfect and implementable Exceptional technical depth No appropriate item is omitted in the Bill All A/SMM rules are adhered to in all the measured items Total Marks  Comments BUILDING MEASUREMENT - QUERY SHEET Blank Query Sheet.xls BM Page 1 of 1 28/03/2014 9:42 AM Student's Name: Student's Number: Project: No. Date Query Answer By Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Project Option 1 – Mussalla Building MUSALLA - BUILDING 510 - LEVEL 01 2012 PROJECT NUMBER UPJ0246 VOL. 1 OF 1 COVER PAGE DOCUMENTATION BY: ARMSTRONG PARKIN ARCHITECTS 41 HIGH STREET FREMANTLE W.A. 6160 BENTLEY CAMPUS University Properties University of Technology   G G H D D  E  M  O  L  I  T  I  O N N P  L  A N N 1:200 WESTERN  AUSTRALIA  6160 ABN  52  009  237  601 T:  9433 8 1388 F:  9433  1991 This  drawing  is  copyright  and  shall  always  remain  the  property f of ARMSTRONG  PARKIN  PTY  LTD  and  must  not  be  used  in  any  manner t without the  prior  written  approval  of  that  company.  Verify  all  dimensions  on  site d and report  all  discrepancies  to  the  Architect.  Await  Architect's  instructions r prior to  the  commencement  of  construction  or  fabrication. mail@armstrongparkin.com.au NORTH 0 0 PROJ APP REVISION REV DATE N DRN  CHK SP AS  CONSTRUCTED 17.06.13 CC SP EXISTING  BUILDING  212 TEXTILES  +  PRINTMAKING EXISTING BUILDING  221 GPO  BOX  U1987  PERTH  WA  6845 TEL  9266 6 9266 FAX  9266  2660 University  Properties University of Technology DRN  BY CLIENT  APP DESIGNED DATE CHECKED PROJ  APP This This drawing drawing is is the the property property of of Curtin Curtin University University and and furnished furnished for for the the sole sole use use of of the the recipient. recipient. Acceptance Acceptance of of the the same same constitutes constitutes an an agreement agreement that that it it will will not not be be published, published, reproduced, reproduced, transmitted transmitted or or given given to to any any other other party party without without our our permission. permission. Infringement Infringement of of the the above above may may attract attract claims claims for for compensation. compensation. CHECK  SITE  DIMENSIONS AND  VERIFY  DRAWINGS PRIOR  TO  CONSTRUCTION BENTLEY  CAMPUS UPJ0246 01B510-A-DP0102 02 25 0 0 1:200 AS  CONSTRUCTED A1 AW 31-05-2012 SP SP SP CURTIN ISSUE CURTIN PROJ  No SCALE DWG  No G DWG STATUS SHEET OF SHEET SIZE MUSALLA DEMOLITION  PLAN BLDG  510  LEVEL  01 R7 R1 R1 R1   G G H S S  I  T E E P  L  A N N 1:200 E MALE ENTRY E FEMALE ENTRY RETAIN  AND T PROTECT G EXISTING VEGETATION RETAIN  AND T PROTECT G EXISTING VEGETATION RETAIN  AND T PROTECT G EXISTING VEGETATION EXISTING  BUILDING  212 TEXTILES  +  PRINTMAKING RETAIN  AND  PROTECT G EXISTING PATHWAY REALIGNED  SEGMENTAL D PAVED PATHWAY  REFER  TO E LANDSCAPE DOCUMENTATION SEGMENTAL  PAVED . PATHWAY. REFER  TO E LANDSCAPE DOCUMENTATION SEGMENTAL  PAVED . PATHWAY. REFER  TO E LANDSCAPE DOCUMENTATION RETAIN  AND T PROTECT G EXISTING PATHWAY CONTRACTORS D COMPOUND WITHIN  CARPARK  9B WESTERN  AUSTRALIA  6160 ABN  52  009  237  601 T:  9433 8 1388 F:  9433  1991 This  drawing  is  copyright  and  shall  always  remain  the  property f of ARMSTRONG  PARKIN  PTY  LTD  and  must  not  be  used  in  any  manner t without the  prior  written  approval  of  that  company.  Verify  all  dimensions  on  site d and report  all  discrepancies  to  the  Architect.  Await  Architect's  instructions r prior to  the  commencement  of  construction  or  fabrication. mail@armstrongparkin.com.au NORTH 0 0 PROJ APP REVISION REV DATE N DRN  CHK SP AS  CONSTRUCTED 17.06.13 CC SP E FEMALE COURTYARD E MALE COURTYARD BUILDING  501 MUSALLA FFL 5 9.475 RETAIN  AND  PROTECT G EXISTING GRASSED  AREA LINE  OF  COURTYARD  FENCE  TO  MALE  + E FEMALE COURTYARDS.  REFER  TO  DRAWING  CP0104 GARDEN  BED R REFER TO E LANDSCAPE DOCUMENTATION GARDEN  BED.  REFER O TO LANDSCAPE  DOCUMENTATION. SEGMENTAL  PAVED  PATHWAY.  REFER O TO E LANDSCAPE DOCUMENTATION. . STONE H MULCH GROUND . TREATMENT. REFER  TO E LANDSCAPE DOCUMENTATION RETAIN  AND T PROTECT G EXISTING GRASSED  AREA VERANDA WW102 FFL  9.475 VERANDA WW101 FFL  9.475 MUSALLA SITE  PLAN BLDG  510  LEVEL  01 EXISTING  TREE LEGEND EXISTING  TITLE/LOT  BOUNDARY EXISTING  FENCE EXISTING  BUILDING E E  X  I  S  T  I  N  G EXISTING  CONTOUR  LEVEL 29 30.35 EXISTING  SPOT  LEVEL N N  E W W W  O  R  K  S EXTENT  OF  NEW  BUILDING  WORKS RL  30.38 NEW  LEVEL CONCRETE EXTENT  OF  CONTRACTORS  FENCE  LINE NEW  TREE NOTE: : . 1. UNLESS  OTHERWISE  NOTED  ALL  WORK  SHOWN  ON S THIS DRAWING  IS  NEW  WORK . 2. CONNECTION  BETWEEN  ADJACENT  SURFACES: H MATCH DIMENSIONS  +  LEVELS  OF  NEW  SURFACE  WITH  EXISTING. E ENSURE FLUSH  +  EVEN  TRANSITION  BETWEEN  SURFACES.  MAXIMUM L VERTICAL DISTANCE  5MM  UNLESS D NOTED OTHERWISE . 3. ENSURE  TO  CO-ORDINATE  INFORMATION  IN  THIS G DRAWING WITH  OTHER  ARCHITECTURAL  DOCUMENTATION  AND  ALL D ASSOCIATED CIVIL,  STRUCTURAL,  HYDRAULIC, , ELECTRICAL  + E LANDSCAPE DOCUMENTATION GAS/WATER R METER BOX . ENCLOSURE. REFER  TO  DETAIL 3 123 ON  DRAWING  FD0122 A CAMERA POLE. REFER O TO , ELECTRICAL, STRUCTURAL + + Y SECURITY DOCUMENTATION L L  O  C  A  T  I  O N N P  L  A N N 1:5000 NORTH BUILDING  501 MUSALLA  LOCATION PAVING  DRAINS REFER O TO C HYDRAULIC S ENGINEERS DOCUMENTATION SETOUT  POINT NEW  CONTOUR  LEVEL 29 212 MANNING  ROAD BRAND  DRIVE EXTENT  OF S CONTRACTORS COMPOUND N WITHIN CARPARK  9B SEGMENTAL  PAVEMENT.  REFER  TO  LANDSCAPE  DOCUMENTATION SETOUT  POINT  1 64.4068 NORTH QIBLA CONTRACTORS  FENCE  LINE CAMERA  POLE.  REFER O TO ELECTRICAL,  STRUCTURAL + + SECURITY  DOCUMENTATION SEGMENTAL D PAVED PATHWAY. R REFER TO E LANDSCAPE DOCUMENTATION. . ORIENTATION E RELATIVE TO  NORTH MARQUEE R POWER SUPPLY.  REFER O TO L ELECTRICAL DOCUMENTATION SETOUT  POINT  2 DOB LINE  OF  SUSPENDED N CURTAIN OVER  SHOWN  DASHED FR FR S S NB NB RECESSED R ROLLER SHUTTER LINE  OF  ROOF  OVER SHOWN  DASHED FFL  9.475 BOOK  SHELVING  UNIT  TYPE  A REFER  TO  DETAIL  110 N ON DRAWING  FD0121 CORIAN T SEAT ESSB MSSB 1 1 2 2 3 3 FIBRE , COMMS., SECURITY S SERVICES +  AV  RACK. R REFER TO L ELECTRICAL DOCUMENTATION AUDIO  CONTROL T CABINET REFER  TO L ELECTRICAL DOCUMENTATION FEMALE  ABLUTIONS 106 TILES MALE  PRAYER  SPACE 101 CARPET STORE  1. 104 VINYL MALE  KITCH. 103 TILES MIHRAB 101 CARPET MALE  ABLUTIONS 107 TILES . COMMS. ROOM D101 ANTISTATIC  VINYL STORE  2. 102 VINYL ACCESS  TOILET 110 TILES FEMALE  KITCH. 105 TILES FEMALE  PRAYER  SPACE 101 CARPET FEMALE  ENTRY C102 CARPET  TYPE  2 E FEMALE VERANDA WW102 SEALED  CONCRETE A SE0107 B SE0107 A SE0107 C SE0108 C SE0108 D SE0108 B SE0107 D SE0108 GENERAL  LEGEND TOILET  ROLL  HOLDER TRH HB HAND  BASIN SD SOAP  DISPENSER ATRH ACCESS  TOILET  ROLL  HOLDER PB PAPER  TOWEL  DISPENSER H WITH INTEGRATED N BIN AT ACCESS  TOILET ST SQUAT  TOILET FM FLOOR  MAT DOB DONATION  BOX.  REFER  TO  DETAIL  117  ON  DRAWING  FD0121 LEGEND CORRIDOR  2 C102 FLOOR  MAT 40 CD0117 41 CD0117 28 CD0116 08 CD0110 03 CD0110 29 CD0116 109 FD0120 38 CD0111 CORIAN T SEAT DOB FB FLOOR  BOX.  REFER  TO  ELECTRICAL  DOCUMENTATION T T TOILET WASH  TROUGH WT FFL  9.475 CLNR 111 VINYL NOTES 1. UNLESS  OTHERWISE  NOTED  ALL  STUDWORK S IS DIMENSIONED  TO  FACE  OF  STUD 50  DIAMETER  SIPHONIC  RWDP  AND 0 50 DIAMETER  SIPHONIC  OVERFLOW K PIPEWORK DROPPERS  IN  STUD  WALL E FEMALE COURTYARD SEALED  CONCRETE FFL  9.445 E MALE VERANDA WW101 SEALED  CONCRETE FFL  9.475 E MALE COURTYARD SEALED  CONCRETE FFL  9.445 37 CD0111 4 4 5 5 6 6 7 7 8 8 9 9 UP LINE  OF  GLAZING W BELOW SHOWN  DASHED LINE  OF  GLAZING W BELOW SHOWN  DASHED UP UP E101 S SERVICES CUPBOARD REFER O TO DETAIL 8 128 ON G DRAWING FD0123 FEMALE  SCREEN.  REFER  TO  DETAIL 0 120 ON  DRAWING  FD0122 MALE  SCREEN.  REFER O TO DETAIL  119  ON G DRAWING FD0122 CUPBD CUPBOARD CUPBD ROOF  ACCESS  LADDER D1 01 D2 02 D4 03 D5 04 D4 05 D3 06 D1 07 08 D7 D8 09 D6 10 D6 11 D7 12 W1 01 W3 02 W3 03 W2 04 FFL  9.475 ` ` RECESSED R ROLLER SHUTTER D9 13 S S S S 75  DIAMETER  SIPHONIC  RWDP  AND 5 75 DIAMETER  SIPHONIC  OVERFLOW K PIPEWORK DROPPERS  IN  STUD  WALL 75  DIAMETER  SIPHONIC  RWDP  AND 5 75 DIAMETER  SIPHONIC  OVERFLOW K PIPEWORK DROPPERS  IN  STUD  WALL 50  DIAMETER  SIPHONIC  RWDP  AND 0 50 DIAMETER  SIPHONIC  OVERFLOW K PIPEWORK DROPPERS  IN  STUD  WALL JOINT  IN  CORIAN SEAT JOINT  IN  CORIAN  SEAT TENSIONED  FABRIC  SCREEN N ON FABRICATED  H.D.  GALV L STEEL FRAMING CARPET TYPE  1 CARPET TYPE  2 CARPET TYPE  1 CARPET TYPE  2 CARPET TYPE  1 CARPET TYPE  2 CARPET TYPE  1 CARPET TYPE  2 CARPET TYPE  1 BOOK  SHELVING  UNIT  TYPE  B REFER  TO  DETAIL  112 N ON DRAWING  FD0121 BOOK  SHELVING  UNIT  TYPE  B REFER  TO  DETAIL  112 N ON DRAWING  FD0121 SHOE  STORE T UNIT REFER  TO L DETAIL 118  ON G DRAWING FD0121 CARPET TYPE  2 FOR  CONTINUATION  OF  COURTYARD  LAYOUT  REFER  TO  DRAWING  CP0104 2. REFER  TO  DRAWINGS  RE0118  +  RE0119  FOR M ROOM LAYOUTS 10 CD0111 E SE0107 E SE0107 FB FB FB FB CD0113 16 CORIAN T SEAT LINE  OF  ROOF R OVER SHOWN  DASHED TENSIONED  FABRIC  SCREEN N ON FABRICATED  H.D.  GALV L STEEL FRAMING LINE  OF  ROOF R OVER SHOWN  DASHED CORIAN T SEAT LINE  OF  ROOF  OVER SHOWN  DASHED SHOE  STORE  UNIT R REFER TO  DETAIL  118 N ON DRAWING  FD0121 TIMBER  STUD  FRAMED  WALL  WITH  INSULATION  AS . SPECIFIED. TYPICALLY  ALL  INTERNAL  WALLS  ARE  LINED H WITH PLASTERBOARD  AS  SPECIFIED  TO  BOTH  SIDES  EXCEPT E MALE +  FEMALE  ABLUTIONS,  ACCESS  TOILET  +  CLEANER H WHICH ARE  TO  BE  LINED H WITH FIBRE  CEMENT  SHEETS S AS SPECIFIED.  ALL  EXTERNAL  WALLS  TO  BE  LINED L INTERNAL WITH  PLASTERBOARD.  REFER  TO M ROOM ELEVATIONS + + SECTIONS  FOR  FINISHES.  REFER  TO  EXTERNAL S ELEVATIONS FOR  FINISH  TO  EXTERNAL  WALLS. PLYWOOD  LINED  TIMBER  TRUSS  WITH  INSULATION S AS SPECIFIED.  REFER  TO  STRUCTURAL S ENGINEERS DOCUMENTATION.  INSIDE  FACE  OF  PLYWOOD  TRUSS N WITHIN MALE  ENTRY,  MALE  PRAYER  SPACE,  FEMALE , ENTRY, E FEMALE PRAYER  SPACE  TO  BE  LINED  WITH  PLASTERBOARD S AS SPECIFIED.  REFER  TO  EXTERNAL  ELEVATIONS  FOR  FINISH O TO EXTERNAL  FACE. OUTSIDE  FACE F OF PLYWOOD  TRUSS S IS SETOUT  LINE OUTSIDE  FACE F OF PLYWOOD  TRUSS S IS SETOUT  LINE F101 E FIRE R EXTINGUISHER LOCATED N IN CUPBOARD SERVICES  CUPBOARD.  REFER  TO L DETAIL 132  ON  DRAWING  FD0123 F102 FIRE  EXTINGUISHER D LOCATED IN  CUPBOARD 39 CD0113 CURTAIN  2 CURTAIN  1 LINE  OF G CLADDING BELOW  TRUSS N SHOWN D DASHED LINE  OF G CLADDING BELOW  TRUSS N SHOWN D DASHED 32 CD0117 114 FD0121 ACCESS  PANEL  AT  HIGH  LEVEL MALE  ENTRY C101 CARPET  TYPE  1 CORRIDOR  1 C101 FLOOR  MAT CORIAN N SCREEN PANEL CD0111 36 125 FD0122 125 FD0122 1045 2840 120 3630 120 2220 120 6000 3745 120 2925 0 1020  180 2170 900 1475 950 520 4500 120 2055 D7 G OPENING D4  OPENING 100 1120 835 120 D6  OPENING 680 4425 300 2925 120 4720 9750 2 W2 FEMALE N KITCHEN STORE FEMALE  ABLUTIONS FEMALE  ENTRY  +  CORRIDOR  2 6135 FEMALE  PRAYER  SPACE FEMALE  /  MALE  PRAYER  SPACE STORE 70 CLEANER 120 ACCESS  TOILET 4125 120 FEMALE  VERANDA 1045 2840 120 2625 6000 650 600 2380 120 2925 0 1020  180 900 1860 465 120 2055 100 1120 835 120 4425 300 1845 150 2040 1800 2925 120 23175 8250 7635 70 120 775 120 4125 120 MALE  VERANDA MALE  ENTRY  /  CORRIDOR  1 3210 1 W1 COMMS.  ROOM 1845 150 MALE  PRAYER  SPACE D4  OPENING D7 G OPENING MALE  ABLUTIONS 1785 3000 D6  OPENING MALE N KITCHEN 9 D9 120 2220 120 STORE ACCESS  TOILET CLEANER 365 5235 365 150 395 120 4935 120 600 900 1260 120 D5  OPENING R CLEANER MALE  VERANDA 5235 FEMALE  VERANDA 4935 150 395 120 2760 ACCESS T TOILET 2760 1850 1080 1570 D1  OPENING D3  OPENING 1850 1080 1570 D1 G OPENING D2  OPENING 3525 120 3370 120 2090 MALE  ABLUTIONS FEMALE  ABLUTIONS 120 3525 1870 645 1445 W3 120 3815 120 MALE  PRAYER  SPACE 2625 2640 1200 120 980 MALE  ENTRY  /  CORRIDOR  1 FEMALE  ENTRY  /  CORRIDOR  2 4500 1870 6000 1200 1200 600 120 200 155 120 SETOUT  POINT - - END  OF  PLYWOOD  TRUSS 70 70 725 190 SETOUT  POINT - - END  OF  PLYWOOD  TRUSS 440 2200 8920 440 2200 150 170 120 120 2280 COMMS.  ROOM 120 3880 120 2280 STORE  2. 120 W3 150 170 120 4505 FEMALE  PRAYER  SPACE MALE  PRAYER  SPACE 120 4650 550 850 3250 D8 1200 455 1870 CORRIDOR  1 MALE  ENTRY 515 465 3525 2205 120 2325 MALE  KITCH. FEMALE  KITCH. 465 1200 455 1870 3525 515 3990 585 585 2910 2790 MIHRAB FEMALE  ENTRY CORRIDOR  2 14200 TRUSS TRUSS TRUSS TRUSS 2690 620 C L L C L L 3560 405 C L L C L L 530 C L L 2120 C L L 109 9 108 600 600 100 100 FE FE FIRE  EXTINGUISHER FE MIN. CLEAR 1 1 A 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 11 12 B C D D E E F G G H A A B C D D E E F F G G H F F  L  O  O R R P  L  A N N 1:50 WESTERN  AUSTRALIA  6160 ABN  52  009  237  601 T:  9433 8 1388 F:  9433  1991 This  drawing  is  copyright  and  shall  always  remain  the  property f of ARMSTRONG  PARKIN  PTY  LTD  and  must  not  be  used  in  any  manner t without the  prior  written  approval  of  that  company.  Verify  all  dimensions  on  site d and report  all  discrepancies  to  the  Architect.  Await  Architect's  instructions r prior to  the  commencement  of  construction  or  fabrication. mail@armstrongparkin.com.au MUSALLA FLOOR  PLAN 0 0 PROJ APP REVISION REV DATE N DRN  CHK SP AS  CONSTRUCTED 17.06.13 CC SP NORTH GPO BOX U1987 PERTH WA 6845   COL

代写 Building Measurement 

  9595  NOMINAL SLAB  EDGE R R  1510 SLAB  EDGE R R  4000 SLAB  EDGE R R  1450 SLAB  EDGE 2370 2370 SLAB  EDGE 47° 60° 64° SLAB  EDGE SLAB  EDGE 50 1375 1000 650 50 1375 1000 650 COL COL LIGHT  POLE.  REFER O TO ELECTRICAL S ENGINEERS DOCUMENTATION CONCRETE  SLAB  EDGE.  RL  9.445 TAP TAP TAP TAP TAP CONCRETE B SLAB EDGE.  RL  9.445 CONCRETE  SLAB . EDGE. RL  9.445 CJ 3850 4270 3 3  NO.  TREE . GRATES. REFER  TO E LANDSCAPE DOCUMENTATION SCREEN  WALL.  PAINT D FINISHED F.C.  SHEET  CLADDING  TO H BOTH SIDES  OF  FABRICATED  H.D. V GALV G FRAMING BETWEEN  MALE  + FEMALE  COURTYARDS TAP TAP WASH  TROUGH WT FALL DRAIN  GRATE FALL FALL COURTYARD  DRAIN  RL  9.420 REFER  TO  HYDRAULIC S ENGINEERS DOCUMENTATION COURTYARD  DRAIN  RL  9.420 REFER  TO C HYDRAULIC ENGINEERS  DOCUMENTATION CD0117 33 CD0117 34 FD0120 107 - - - CD0117 35 CJ CJ SETOUT  POINT  3 SETOUT  POINT  2 CJ SCREEN  FENCE  PROFILED L METAL CLADDING  TO  BOTH  SIDES F OF H.G.  GALV  STEEL  COLUMNS. CD0117 33 R2 L FFL 9.4 45 L FFL 9.4 45 R1 COL COL FALL FALL FALL FALL FALL FALL FALL FALL R3 EDGE  OF  WATER  WASHED CONCRETE REFER  TO  DRAWING  FP0103  FOR  CONTINUATION ALUMINIUM  CLADDING  TO H BOTH SIDES  OF  FABRICATED . H.D. GALV  STEEL  FENCE  PANELS ALUMINIUM  CLADDING  TO H BOTH SIDES  OF  FABRICATED . H.D. GALV  STEEL  FENCE  PANELS EDGE  OF  WATER  WASHED CONCRETE STONE  MULCH.  REFER O TO LANDSCAPE  DOCUMENTATION SETOUT  R2 1540 C C SETOUT  R1 SETOUT  LINE  FOR  COURTYARD FROM  END  OF  PLYWOOD  TRUSS LINE  OF  SLAB  EDGE C 1150 TREE  GRATE SETOUT SCREEN  FENCE. D PROFILED METAL  CLADDING  TO H BOTH SIDES  OF  H.D. V GALV STEEL  COLUMNS 2700 1200 C FACE  OF  MALE D COURTYARD SLAB  EDGE R3  SETOUT LINE  OF  SETOUT  POINT  3 8525 C 155 R1  SETOUT 150 5675 LINE  OF  SETOUT  POINT  2 1200 R2  SETOUT C 2705 LINE  OF  FEMALE D COURTYARD SLAB  EDGE 2515 DRAIN  GRATE CJ CJ CJ CJ CJ CJ CJ CJ 2 2  NO.  TREE . GRATES. REFER  TO E LANDSCAPE DOCUMENTATION CJ COL COL COL C 3400 TREE GRATE 500 C TREE GRATE C 1150 TREE  GRATE SETOUT C 500 3400 TREE  GRATE C TREE  GRATE 3400 C TREE  GRATE COL COL COL COL CONCRETE  UPSTAND 350 1305 DRAIN CJ B HK HOSE  COCK HK F F EL0106 F F EL0106 GRATED  FLOOR  DRAIN GRATED  FLOOR  DRAIN EQ EQ 50 50 SCREEN  WALL  ELEVATION  -  FEMALE D COURTYARD 1:50 2400  NOM 2400  NOM 2400  NOM 2400  NOM 50x75  RHS TOP  OF  SLAB  9.445 C C C C RL  11.410 LINE  OF  75x75  SHS N COLUMN SHOWN  DASHED LINE  OF  50x75  RHS  TOP L RAIL SHOWN  DASHED LINE  OF  50x75  RHS M BOTTOM RAIL  SHOWN  DASHED 75x75  SHS  COLUMNS 75x75  SHS N MIDSPAN BETWEEN  COLUMNS FC  SHEET  CLADDING H WITH EXPRESSED  JOINTS. T PAINT FINISHED LINE  OF D EXPRESSED JOINTS  IN  FC  SHEET 50 LINE  OF  FACE OF  BUILDING COL COL COL COL COL C FULL  HEIGHT T PAINT FINISHED V GALV PRESSING  TO  END F OF SCREEN  WALL  TO T FIT UNDER  FC  SHEET + + CAP  END  OF  COLUMN TWO  PART L METAL PRESSING  TO  END F OF SCREEN  WALL FEMALE  ENTRY  FENCE  PANELS 1:50 NOTE:  MALE  ENTRY  HANDED LINE  OF  75x75  SHS N COLUMN SHOWN  DASHED 400 375 LINE  OF  50x75  RHS  TOP L RAIL SHOWN  DASHED FFL  9.445 C C C RL  11.410 465 465 C C C 200 C LINE  OF  50x75  RHS M BOTTOM RAIL  SHOWN  DASHED SECURITY  SLAVE  INTERCOM  + D CARD READER.  REFER  TO  SECURITY + + ELECTRICAL  DOCUMENTATION STONE  MULCH.  REFER O TO LANDSCAPE  DOCUMENTATION LINE  OF  EDGE  OF  WALL  + B SLAB BELOW  SHOWN  DASHED LINE  OF  EDGE  OF  WALL  + B SLAB BELOW  SHOWN  DASHED SE0107 COL COL G1 14 COL ALUMINIUM  CLADDING  TO H BOTH SIDES,  TOP  +  ENDS  OF E FENCE SIDE  PANELS  + . GATE. PROVIDE  CONDUITS N WITHIN STEEL  COLUMNS  FOR Y SECURITY +  ELECTRICAL  INSTALLATION O TO ELECTRIC  GATE , LOCK, INTERCOM  +  CARD  READER COL 150 C 150 C 150 C 150 150 150 C C C FFL  9.475 FFL  9.475 5210   F F G G H GPO BOX U1987 PERTH WA 6845 TEL 9266 9266 FAX 9266 2660 University Properties University of Technology DRN  BY CLIENT  APP DESIGNED DATE CHECKED PROJ  APP This drawing is the property of Curtin University and furnished for the sole use of the recipient. Acceptance of the same constitutes an agreement that it will not be published, reproduced, transmitted or given to any other party without our permission. Infringement of the above may attract claims for compensation. CHECK  SITE  DIMENSIONS AND  VERIFY  DRAWINGS PRIOR  TO  CONSTRUCTION BENTLEY  CAMPUS UPJ0246 01B510-A-CP0104 04 25 0 0 1:50 AS  CONSTRUCTED A1 DS 31-05-2012 SP SP SP CURTIN ISSUE CURTIN PROJ  No SCALE DWG  No G DWG STATUS SHEET OF SHEET SIZE WESTERN  AUSTRALIA  6160 ABN  52  009  237  601 T:  9433 8 1388 F:  9433  1991 This  drawing  is  copyright  and  shall  always  remain  the  property f of ARMSTRONG  PARKIN  PTY  LTD  and  must  not  be  used  in  any  manner t without the  prior  written  approval  of  that  company.  Verify  all  dimensions  on  site d and report  all  discrepancies  to  the  Architect.  Await  Architect's  instructions r prior to  the  commencement  of  construction  or  fabrication. mail@armstrongparkin.com.au MUSALLA BLDG  510  LEVEL  01 COURTYARD  PLAN   PB D08 09 CEILING  SPACE CEILING  SPACE TRAFFICABLE . WALKWAY. REFER  TO  ROOF Y SAFETY DRAWINGS EC W01 01 PROFILED  METAL  WALL G CLADDING ON  SARKING  ON D INSULATED PLYWOOD  FACED  TRUSS.  REFER O TO STRUCTURAL  DOCUMENTATION SUSPENDED H FLUSH PLASTERBOARD  CEILING H WITH INSULATION  OVER.  PAINT  FINISH SUSPENDED H FLUSH PLASTERBOARD  CEILING H WITH INSULATION  OVER.  PAINT  FINISH PROFILED  METAL  ROOF G SHEETING ON  FOIL  FACED N INSULATION BLANKET  ON  STEEL  SAFETY  MESH PROFILED  METAL  ROOF G SHEETING ON  FOIL  FACED N INSULATION BLANKET  ON  STEEL  SAFETY  MESH FRAMED D PLASTERBOARD CEILING  WITH N INSULATION OVER.  PAINT  FINISH MALE  SCREEN  UNIT. R REFER TO  DETAIL  119  ON G DRAWING FD0122 FEMALE  SCREEN  UNIT. R REFER TO  DETAIL  120  ON G DRAWING FD0122 SEGMENTAL  PAVED . PATHWAY. REFER  TO E LANDSCAPE DOCUMENTATION STONE  MULCH . TREATMENT. REFER  TO E LANDSCAPE DOCUMENTATION CONCRETE  FLUSH . KERB. REFER  TO L STRUCTURAL ENGINEERS  DOCUMENTATION SEGMENTAL D PAVED PATHWAY.  REFER O TO E LANDSCAPE DOCUMENTATION STONE  MULCH  TREATMENT.  REFER TO  LANDSCAPE  DOCUMENTATION CONCRETE  FLUSH . KERB. REFER  TO L STRUCTURAL ENGINEERS  DOCUMENTATION PB CEILING  SPACE CEILING  SPACE CEILING  SPACE D6 10 D04 03 SUSPENDED H FLUSH PLASTERBOARD  CEILING H WITH INSULATION  OVER.  PAINT  FINISH SUSPENDED H FLUSH PLASTERBOARD  CEILING H WITH INSULATION  OVER.  PAINT  FINISH SUSPENDED D PLASTERBOARD CEILING  WITH  INSULATION . OVER. PAINT  FINISH D FRAMED D PLASTERBOARD CEILING H WITH INSULATION . OVER. PAINT  FINISH REFER  TO M ROOM S ELEVATIONS DRAWING  RE0119 REFER  TO  ROOM S ELEVATIONS DRAWING  RE0118 REFER  TO  ROOM S ELEVATIONS DRAWING  RE0118 REFER  TO M ROOM S ELEVATIONS DRAWING  RE0119 REFER O TO M ROOM S ELEVATIONS G DRAWING RE0119 DIVIDING  FABRIC  CURTAIN  1 + + CURTAIN  RAIL  FIXED  TO  STEEL M BEAM OVER.  REFER  TO  DETAIL  23 N ON DRAWING  CD0114 SUPPLY  AIR  GRILLE.  REFER O TO MECHANICAL  DOCUMENTATION PROFILED  METAL  ROOF G SHEETING ON  FOIL  FACED N INSULATION BLANKET  ON  STEEL  SAFETY  MESH RECESSED  LIGHT  FITTING N IN SUSPENDED  CEILING.  REFER O TO ELECTRICAL  DOCUMENTATION EC PROFILED  METAL  ROOF G SHEETING ON  FOIL  FACED N INSULATION BLANKET  ON  STEEL  SAFETY  MESH PROFILED  METAL  ROOF G SHEETING ON  FOIL  FACED N INSULATION BLANKET  ON  STEEL  SAFETY  MESH TRAFFICABLE . WALKWAY. REFER  TO  ROOF Y SAFETY DRAWINGS LINE  OF  EXISTING D GROUND LEVEL STONE  MULCH  GROUND . TREATMENT. REFER  TO  LANDSCAPE  DOCUMENTATION CONCRETE  FLUSH  KERB.  REFER O TO STRUCTURAL  ENGINEERS  DOCUMENTATION LINE  OF  EXISTING  GROUND L LEVEL SHOWN  DASHED CONCRETE  SLAB  ON  WPM. R REFER TO  STRUCTURAL S ENGINEERS DOCUMENTATION TENSIONED C FABRIC SUNSHADE  SCREEN. D HD GALV  FABRICATED L STEEL FRAMING.  REFER  TO L DETAIL 10  ON  DRAWING  CD0111 LINE  OF  LANDSCAPE . LEVELS. REFER  TO E LANDSCAPE DOCUMENTATION METAL  PRESSING  TYPE . Y. POWDERCOAT  FINISH SEGMENTAL D PAVED PATHWAY.  REFER O TO LANDSCAPE  DOCUMENTATION CD0113 15 LINE  OF  EXISTING D GROUND LEVEL  SHOWN  DASHED STONE  MULCH . TREATMENT. REFER  TO E LANDSCAPE DOCUMENTATION REINFORCED  CONCRETE  SLAB N ON WPM  ON  COMPACTED  FILL. R REFER TO  STRUCTURAL . DOCUMENTATION. REFER  TO  SPECIFICATION R FOR RETICULATED  TERMITE T TREATMENT SYSTEM LEGEND EC EVAPORATIVE  COOLING  UNIT  REFER O TO MECHANICAL  ENGINEERS N DOCUMENTATION FOR  DETAIL PB FLUSHED  PLASTERBOARD  AS . SPECIFIED. PAINT  FINISH REFER  TO  ELECTRICAL  +  MECHANICAL  DOCUMENTATION  FOR T EXTENT OF  ALL  PENETRATIONS  REQUIRED  IN  CEILINGS  AND  WALLS R FOR ELECTRICAL  +  MECHANICAL  SERVICES ALL  MECHANICAL  SERVICE  ITEMS  INCLUDING  DUCTWORK  ARE N SHOWN INDICATIVE  ONLY.  REFER  TO  MECHANICAL S ENGINEERS DOCUMENTATION  FOR  DETAIL 1.  UNLESS  OTHERWISE  NOTED  ALL  WORK  SHOWN  ON  THIS  DRAWING S IS NEW  WORK 2.  ENSURE  TO  CO-ORDINATE  INFORMATION  IN  THIS  DRAWING  WITH R OTHER ARCHITECTURAL  DOCUMENTATION  AS  WELL  AS  ALL D ASSOCIATED CONSULTANT  DOCUMENTATION  FOR  THIS  PROJECT . 3. UNLESS  NOTED  OTHERWISE  ALL  EXPOSED  STRUCTURAL L STEEL MEMBERS  INCLUDING  BEAMS,  TRUSSES,  BRACING,  COLUMNS  + S RHS PURLINS  TO  HAVE  PAINT  FINISH. 4.  ALL  PLASTERBOARD  CEILINGS  TO  HAVE  PAINT  FINISH.. . CD0112 12 U/S  CEILING U/S  STEEL  BEAM RMDF MIHRAB 101 PROFILED  METAL L WALL CLADDING  ON  SARKING N ON PLYWOOD  ON D STUD FRAMING  WITH  INSULATION CURTAIN  RAIL  STEEL  BEAM PAINT  FINISHED  FIBRE T CEMENT SHEETING  ON  SARKING  ON D STUD FRAMING  WITH  INSULATION REFER  TO E LANDSCAPE DOCUMENTATION R FOR AMENDMENTS  TO D FINISHED GROUND  LINE RMDF D SUSPENDED CURTAIN L RAIL FIXED  TO T PAINT FINISHED L STEEL BEAM  OVER REINFORCED  CONCRETE  SLAB N ON WPM  ON  COMPACTED  FILL. R REFER TO  STRUCTURAL . DOCUMENTATION. REFER  TO  SPECIFICATION R FOR RETICULATED  TERMITE T TREATMENT SYSTEM FEMALE  PRAYER  SPACE 101 MALE  PRAYER  SPACE 101 RMDF RMDF CURTAIN  RAIL  FIXED  TO  WALL SUPPLY  AIR  GRILLE.  REFER O TO MECHANICAL  DOCUMENTATION CEILING  SPACE EXTENT  OF  CURTAIN  1  IN N OPEN POSITION PB PAINT  FINISHED D PLASTERBOARD LINING  TO  INSIDE PAINT  FINISHED  FIBRE T CEMENT SHEETING  ON  SARKING  ON D STUD FRAMING  WITH  INSULATION OFFSET  SEWER  PUMP N STATION VENT  PIPE  IN  CEILING E SPACE TO  LOCATION  OF F ROOF PENETRATION PROFILED  METAL F ROOF SHEETING  ON  FOIL D FACED INSULTATION  BLANKET N ON STEEL  SAFETY  MESH TOP  OF  PLYWOOD  TRUSS TOP  OF  WALL U/S  CEILING REINFORCED  CONCRETE  SLAB N ON WPM  ON  COMPACTED  FILL. R REFER TO  STRUCTURAL . DOCUMENTATION. REFER  TO  SPECIFICATION R FOR RETICULATED  TERMITE T TREATMENT M SYSTEM RMDF RMDF PB CEILING  SPACE LINE  OF  EXISTING D GROUND LEVEL  SHOWN  DASHED PROFILED  METAL  WALL G CLADDING ON  SARKING  ON D INSULATED PLYWOOD  FACED  TRUSS.  REFER O TO STRUCTURAL  DOCUMENTATION RMDF RECESSED  MDF  SKIRTING.  PAINT  FISH NOTE PAINT D FINISHED PLASTERBOARD G LINING TO  INSIDE  OF D PLYWOOD FACED  TRUSS PAINT  FINISHED D PLASTERBOARD LINING  TO  INSIDE  OF D PLYWOOD FACED  TRUSS PAINT D FINISHED PLASTERBOARD G LINING TO  INSIDE STEEL  BEAM R FOR CURTAIN  RAIL REMOVABLE  CORIAN  PANEL PROVIDE  CONCEALED  SPIGOT T AT END  OF  BEAM  FOR N CONNECTION INTO  WALL  FRAMING FRAMED D PLASTERBOARD CEILING H WITH INSULATION  OVER. METAL  PRESSING  TYPE . W. POWDERCOAT  FINISH METAL  PRESSING  TYPE . W. POWDERCOAT  FINISH METAL  PRESSING  TYPE . W. POWDERCOAT  FINISH METAL  PRESSING  TYPE . W. POWDERCOAT  FINISH   H WESTERN  AUSTRALIA  6160 ABN  52  009  237  601 T:  9433 8 1388 F:  9433  1991 This  drawing  is  copyright  and  shall  always  remain  the  property f of ARMSTRONG  PARKIN  PTY  LTD  and  must  not  be  used  in  any  manner t without the  prior  written  approval  of  that  company.  Verify  all  dimensions  on  site d and report  all  discrepancies  to  the  Architect.  Await  Architect's  instructions r prior to  the  commencement  of  construction  or  fabrication. mail@armstrongparkin.com.au MUSALLA SECTIONS_02 0 0 PROJ APP REVISION REV DATE N DRN  CHK SP AS  CONSTRUCTED 17.06.13 CC SP GPO  BOX  U1987  PERTH  WA  6845 TEL  9266 6 9266 FAX  9266  2660 University  Properties University of Technology DRN  BY CLIENT  APP DESIGNED DATE CHECKED PROJ  APP This This drawing drawing is is the the property property of of Curtin Curtin University University and and furnished furnished for for the the sole sole use use of of the the recipient. recipient. Acceptance Acceptance of of the the same same constitutes constitutes an an agreement agreement that that it it will will not not be be published, published, reproduced, reproduced, transmitted transmitted or or given given to to any any other other party party without without our our permission. permission. Infringement Infringement of of the the above above may may attract attract claims claims for for compensation. compensation. CHECK  SITE  DIMENSIONS AND  VERIFY  DRAWINGS PRIOR  TO  CONSTRUCTION BENTLEY  CAMPUS UPJ0246 01B510-A-SE0108 08 25 0 0 1:50 AS  CONSTRUCTED A1 AW 31-05-2012 SP SP SP CURTIN ISSUE CURTIN PROJ  No SCALE DWG  No G DWG STATUS SHEET OF SHEET SIZE BLDG  510  LEVEL  01 LEGEND EC EVAPORATIVE  COOLING  UNIT  REFER O TO MECHANICAL  ENGINEERS N DOCUMENTATION FOR  DETAIL PB FLUSHED  PLASTERBOARD  AS . SPECIFIED. PAINT  FINISH REFER  TO  ELECTRICAL  +  MECHANICAL  DOCUMENTATION  FOR T EXTENT OF  ALL  PENETRATIONS  REQUIRED  IN  CEILINGS  AND  WALLS R FOR ELECTRICAL  +  MECHANICAL  SERVICES ALL  MECHANICAL  SERVICE  ITEMS  INCLUDING  DUCTWORK  ARE N SHOWN INDICATIVE  ONLY.  REFER  TO  MECHANICAL S ENGINEERS DOCUMENTATION  FOR  DETAIL 1.  UNLESS  OTHERWISE  NOTED  ALL  WORK  SHOWN  ON  THIS  DRAWING S IS NEW  WORK 2.  ENSURE  TO  CO-ORDINATE  INFORMATION  IN  THIS  DRAWING  WITH R OTHER ARCHITECTURAL  DOCUMENTATION  AS  WELL  AS  ALL D ASSOCIATED CONSULTANT  DOCUMENTATION  FOR  THIS  PROJECT . 3. UNLESS  NOTED  OTHERWISE  ALL  EXPOSED  STRUCTURAL L STEEL MEMBERS  INCLUDING  BEAMS,  TRUSSES,  BRACING,  COLUMNS  + S RHS PURLINS  TO  HAVE  PAINT  FINISH. 4.  ALL  PLASTERBOARD  CEILINGS  TO  HAVE  PAINT  FINISH.. . RMDF RECESSED  MDF  SKIRTING.  PAINT  FISH NOTE CONCRETE  FLUSH . KERB. REFER  TO L STRUCTURAL ENGINEERS  DOCUMENTATION 3600MM L AFFL U/S  CEILING FFL  9.475 RL  9.835 3600MM L AFFL U/S  CEILING FFL  9.475 RL  9.835 FEMALE  ENTRY C102 S S  E  C  T  I  O N N C  - C C 1:50 S S  E  C  T  I  O N N D  - D D 1:50 MALE  PRAYER SPACE 101 MIHRAB 101 CD0113 17 MALE  PRAYER SPACE 101 PROFILED  METAL  WALL G CLADDING ON  SARKING  ON D INSULATED PLYWOOD  FACED  TRUSS.  REFER O TO STRUCTURAL  DOCUMENTATION SUSPENDED  FLUSH D PLASTERBOARD CEILING  WITH  INSULATION  OVER. T PAINT FINISH PROFILED  METAL  ROOF G SHEETING ON  FOIL  FACED N INSULATION BLANKET  ON  STEEL  SAFETY  MESH LINE  OF  EXISTING  GROUND  LEVEL SHOWN  DASHED SEGMENTAL  PAVED . PATHWAY. REFER  TO E LANDSCAPE DOCUMENTATION STONE  MULCH D GROUND TREATMENT.  REFER  TO E LANDSCAPE DOCUMENTATION CONCRETE  FLUSH . KERB. REFER  TO L STRUCTURAL ENGINEERS  DOCUMENTATION PROFILED  METAL  ROOF G SHEETING ON  FOIL  FACED N INSULATION BLANKET  ON  STEEL  SAFETY  MESH PB PB PB PROFILED  METAL  WALL G CLADDING ON  SARKING  ON D INSULATED PLYWOOD  FACED  TRUSS.  REFER O TO STRUCTURAL  DOCUMENTATION CEILING  SPACE W02 04 W01 01 BOOK  SHELVING  UNIT  TYPE . B. REFER  TO  DETAIL  112 N ON DRAWING  FD0121 SAND  PAD W03 03 W03 02 SEGMENTAL  PAVED . PATHWAY. REFER  TO E LANDSCAPE DOCUMENTATION STONE  MULCH D GROUND TREATMENT.  REFER O TO LANDSCAPE  DOCUMENTATION REFER  TO E LANDSCAPE DOCUMENTATION  FOR S AMENDMENTS TO  FINISHED  GROUND  LINE TENSIONED  FABRIC E SUNSHADE SCREEN.  HD  GALV D FABRICATED STEEL  FRAMING.  REFER O TO DETAIL  10  ON  DRAWING  CD0111 SUSPENDED  FC  SHEET D LINED SOFFIT  WITH N INSULATION OVER.  PAINT  FINISH FC  SHEET  LINING  ON G SARKING ON  STUD  FRAMING.  PAINT  FINISH W03 03 STONE  MULCH D GROUND TREATMENT.  REFER O TO LANDSCAPE  DOCUMENTATION CONCRETE  FLUSH . KERB. REFER  TO L STRUCTURAL ENGINEERS  DOCUMENTATION REFER  TO E LANDSCAPE DOCUMENTATION R FOR AMENDMENTS  TO D FINISHED GROUND  LINE PB PB CEILING  SPACE CEILING  SPACE SUSPENDED  RAKING D PLASTERBOARD CEILING  WITH  INSULATION . OVER. PAINT  FINISH W01 01 EXTENT OF LOW LEVEL WINDOW SHOE  STORAGE.  REFER  TO  DETAIL  118 N ON DRAWING  FD0121 FC  SHEET  LINING  ON  SARKING  ON D STUD FRAMING.  PAINT  FINISH. SUSPENDED  FC  SHEET  LINED  SOFFIT H WITH INSULATION  OVER.  PAINT  FINISH METAL  PRESSING  TYPE  M. T POWDERCOAT FINISH PROFILED  METAL  ROOF  SHEETING  ON L FOIL FACED  INSULATION  BLANKET  ON L STEEL SAFETY  MESH RECESSED  LIGHT  FITTING.  REFER O TO ELECTRICAL  DOCUMENTATION RECESSED  LIGHT . FITTING. FRAME  RECESSED D AROUND FITTING.  REFER O TO ELECTRICAL  DOCUMENTATION LEGEND CD0110 05 CD0110 04 CD0113 18 MALE  PRAYER  SPACE 101 FEMALE  PRAYER  SPACE 101 DIVIDING C FABRIC CURTAIN.  REFER O TO SPECIFICATION RMDF RL 5 13.835 TOP  OF  FASCIA  FRAMING FC RMDF CORIAN  SEAT CORIAN  SEAT RMDF REINFORCED  CONCRETE  SLAB N ON WPM  ON  COMPACTED  FILL. R REFER TO  STRUCTURAL . DOCUMENTATION. REFER  TO  SPECIFICATION R FOR RETICULATED  TERMITE T TREATMENT SYSTEM PB STEEL  BEAM G SUPPORTING SUSPENDED  CURTAIN . RAIL. PROVIDE  CONCEALED T SPIGOT AT  END  OF  BEAM R FOR N CONNECTION INTO L WALL FRAMING CD0113 19 PROFILED  METAL F ROOF SHEETING  ON  FOIL D FACED INSULATION  BLANKET N ON STEEL  SAFETY  MESH PROFILED  METAL  ROOF  SHEETING N ON FOIL  FACED  INSULATION  BLANKET N ON STEEL  SAFETY  MESH PB RL 5 13.835 TOP  OF  PLYWOOD  TRUSS CD0113 19 REINFORCED  CONCRETE  SLAB  ON  WPM N ON COMPACTED  FILL.  REFER  TO L STRUCTURAL DOCUMENTATION.  REFER  TO N SPECIFICATION FOR  RETICULATED  TERMITE T TREATMENT SYSTEM RMDF RMDF STEEL  BEAM G SUPPORTING SUSPENDED  CURTAIN  RAIL PAINT  FINISHED D PLASTERBOARD LINING  TO  INSIDE PAINT  FINISHED D PLASTERBOARD LINING  TO  INSIDE FC FC FC PB PB SUSPENDED D PLASTERBOARD CEILING  WITH N INSULATION OVER.  PAINT  FINISH REMOVABLE  500  WIDE  24 K THICK CORIAN  PANEL  HOUSED  INTO m 5mm DEEP  REBATE  IN  CORIAN  SEAT + + REBATED  PAINT  FINISHED  MDF L PANEL IN  WALL.  PROVIE  CORIAN  DOWELS N IN END  OF  CORIAN  PANEL  THAT N CAN BE  INSERTED  INTO  HOLES D DRILLED IN  MDF  WALL  PANEL METAL  PRESSING  TYPE . W. POWDERCOAT  FINISH METAL  PRESSING  TYPE . W. POWDERCOAT  FINISH METAL  PRESSING  TYPE . X. POWDERCOAT  FINISH 9.850 S U/S CD0113 20 CD0113 21 CEILING  SPACE RECESSED  FLOOR  DRAIN H FLUSH WITH  TOP  OF  FINISHED E CONCRETE SLAB.  REFER  TO C HYDRAULIC DOCUMENTATION CONCRETE  SLABS  ON . WPM. REFER  TO L STRUCTURAL ENGINEERS  DOCUMENTATION. CD0110 06 RMDF PB FC FC FC FC LINE  OF  EXISTING D GROUND LEVEL  SHOWN  DASHED CD0110 07 WATER  WASHED  CONCRETE S SLABS ON  WPM.  REFER  TO L STRUCTURAL ENGINEERS  DOCUMENTATION. FEMALE  VERANDA WW102 Project Option 2 – BER School Building 0 25 Government of Treasury and Finance Western Australia Maunsell Australia Pty Ltd 3 Forrest Place GPO Box B59, Perth 6849 Western Australia Tel +61 8 6430 2000 Fax +61 8 6430 2999 perth@maunsell.com ABN 20 093 846 925 THREE CLASSROOM AND MUSIC BLOCK

代写 Building Measurement   


上一篇:代写 MATH 1053 - Quantitative Methods for Business 下一篇:代写 SSUD 71-308 Project Contract Administration