摘要
 
众所周知,桥梁使人们的生活更加便利,有助于促进经济的发展然而,跨河桥设计与施工是一项庞大的土木工程项目,技术复杂,施工难度大,对质量要求高,对环境危害大,对企业风险大在这种情况下,项目评估就显得尤为重要传统上,项目评价包括技术评价、经济评价和环境评价。
 
1.技术评估
 
解决管理人员和工程师面临的许多问题的最有效方法是精心设计的系统研究(Jonathan等人,2006年)中国有句古话:“削尖斧头不耽误砍柴”。为了进行技术评估,我们首先要收集过去、现在和未来的交通量、岩土工程、天气、地形和集水区数据。
 
2经济评价
 
技术只是一个概念,我们可以完成目标,没有物质和人力,这个概念只是在纸上和思想上。金钱是实现这个想法的必要条件投资公司最关心的是项目的利润。
 
在本项目报告中,我们将分析分为技术、经济和环境评价三部分这三个部分都采用了风险管理,选择梁式桥作为合适的桥型,桥的总造价估计为907965美元,至于环境,地形资料是一个参考为今后的施工提供指导,并指出风险所在。

澳洲Assignment代写:技术经济和环境评价与风险管理

EXECUTIVE SUMMARY
It is well acknowledged that bridge makes people’s live convenient and helps to promote the development of economy. However, the design and construction of a bridge to span a river of width 100 metres is a massive civil engineering project, it involves complex technology,difficult construction, high demand of the quality, the harm to environment, the high risk to the company. In this situation, project appraisal is of great importance. Traditionally, project appraisal incorporates technical, economical and environmental evaluation.
1. Technical Assessment
The most effective way to solution of many problems facing administrator and engineers is well-designed ,systematic research(Jonathan et al.,2006). An old Chinese saying goes, “Sharpening your axe will not delay your job of cutting wood”. In order to make technical assessment, the first thing we will have to do is to gather the past, present and future data concerning traffic volume, geotechnical, weather ,topographic and catchment data. 
2. Economic Assessment
Technology is just the concept that we can accomplish the target, without material and man power, the concept is just on the paper and in the thought. Money is the necessity to make the thought come true. The investment company concern most is the profit of the project.
In this project report, we divide the analysis into three parts, technical, economical and environmental evaluation. Risk management is used in all the three parts.Beam bridge is chosen as the suitable type, the total estimated costs of the bridge is 907,965 dollars, as to the environment, topographic data is a reference. It is the guideline for future construction and points out the risk.


上一篇:澳洲代写assignment:企业管理的能力、资源和财政 下一篇:澳洲Media代写:Facebook网用户羞怯与焦虑的关系